11 East Broadway, P.O. Box 190
Red Lion, PA 17356

Red Lion, Pennsylvania

(717) 244-3475

Search Our Site

Annual CCR

Click here to download
a copy of
Red Lion Municipal Authority's
2015 Annual Drinking
Water Quality Report.

 

Red Lion Municipal Authority
11 East Broadway
P.O. Box 190
Red Lion, PA 17356
717-244-3475
Emergency Telephone Number:
717-244-9387
Office Hours:
Monday - Friday 8AM - 4:30PM

Water & Sewer Superintendent:
This email address is being protected from spambots. You need JavaScript enabled to view it.

Assistant
Water & Sewer Superintendent:
This email address is being protected from spambots. You need JavaScript enabled to view it.

 

Water Filtration & Distribution

The Red Lion Municipal Authority utilizes surface water as our source of raw water supply.  The Authority owns and operates two impounding dams, one on Cabin Creek in Windsor Township and the other on Beaver Creek in Chanceford and Lower Windsor Townships.  We also have a raw water pumping station at the confluence of Greenbranch Stream and the Susquehanna River in Chanceford Township.

Under normal conditions, the primary source of raw water is Cabin Creek.  Under high demand conditions, a combination of Cabin Creek and Beaver Creek is utilized and, under drought conditions, it may become necessary to draw water from all three sources.

In 1988 a new treatment plant was constructed at Cabin Creek, replacing the 1925 plant at the same location.  All raw water pases through the treatment plant for purification.  The treatment process consists of aeration, oxidation, coagulation, clarification, filtration, corrosion control, disinfection and fluoridation.  Upon completion of the treatment process, the purified water is pumped into the distribution system.  Our new water treatment plant went online April 7, 2015.

Red Lion Municipal Authority supplies water to Red Lion Borough, portions of Chanceford Township, Windsor Township and York Township.  In addition to the Red Lion Water System, Red Lion Municipal Authority provides all of the water to Windsor Borough Authority and Dallastown-Yoe Water Authority.  Windsor Borough Authority owns and operates a distribution system which serves Windsor Borough. The Dallastown-Yoe Water Authority owns and operates a water distribution system which serves Dallastown Borough, Yoe Borough and portions of York Township.

Our Annual Drinking Water Quality Report is available on the Water and Sewer Forms & Publications page of this website.

New Water Treatment Plant

For many years, we've brought you the fresh, cool taste of safe, clean drinking water.  Now, at the Red Lion Municipal Authority, we're investing in your future health by making additional improvements.  What does it mean to you?  Better taste.  Better quality.  Better service.

To improve water quality, we've constructed a new water treatment plant at Cabin Creek in Windsor Township.  This is the same location as the past water treatment plants.

We currently meet all federal and state drinking water quality standards; however, the former plant was unable to meet the potential, more stringent drinking water standards that are set by the federal Environmental Protection Agency (EPA) and Pennsylvania Department of Environmental Protection (DEP) in the future.  Just as important, we are working on restoring the good taste of our water.  Several years ago, DEP required us to switch to using free chlorine in the disinfectantion process. Unfortunately, this affected the taste of the water.  With the new water treatment plant, we will be switching back to chloramines, which was utilized as a disinfectant in the past, and return our drinking water to the much better taste it had several years ago.  All customers will be notified when the switch to chloramines will take place after DEP approval is given.

The new treatment plant went online April 7, 2015.

Upcoming Events

Mon Apr 24 @12:00AM
STREET SWEEPING
Mon Apr 24 @ 6:00PM -
Redevelopment Commission Meeting
Mon Apr 24 @ 7:00PM -
Recreation Commission Meeting
Tue Apr 25 @12:00AM
STREET SWEEPING
Wed Apr 26 @12:00AM
STREET SWEEPING
Wed Apr 26 @ 6:00PM - 09:00PM
Model Railroad TCA Open House
Wed Apr 26 @ 7:00PM -
Red Lion Municipal Authority Meeting
Thu Apr 27 @12:00AM
STREET SWEEPING
Thu Apr 27 @ 6:00PM - 09:00PM
Model Railroad TCA Open House
Fri Apr 28 @12:00AM
STREET SWEEPING